無論是身處學(xué)校還是步入社會(huì),大家都嘗試過寫作吧,借助寫作也可以提高我們的語言組織能力。寫范文的時(shí)候需要注意什么呢?有哪些格式需要注意呢?這里我整理了一些優(yōu)秀的范文,希望對(duì)大家有所幫助,下面我們就來了解一下吧。
it管理員崗位概述篇一
引導(dǎo)語:息技術(shù)(information technology,縮寫it),是主要用于管理和處理信息所采用的各種技術(shù)的`總稱。以下是百分網(wǎng)小編分享給大家的it管理人員英語簡歷范文,歡迎閱讀!
xxxxx
mba candidate with consulting background in e-commerce, erp implementation, business process redesign and supply chain integration. deep knowledge of information technology, and programming languages. excellent problem solving, analytical, project management and team skills. 3 years of international professional experience. fluent in english and spanish. seeking a position as a business technology consultant.
xxxxxgraduate school of business, bentley college
master of business administration may 2001
graduate courses taken include e-commerce, business processes, and management consulting.
elected member of xxxx society
bachelor of science degree in physics, 1st of the class may 1997
project management:
microsoft project 98/2000.
erp:
experience with sap r/3 mm module.
database management:
microsoft access, oracle 8i, ms sql server 7.0 and dbase iv,foxpro
programming:
c, c++, object oriented design and analysis, java.
web development:
html, javascript, dream weaver, fireworks, ms frontpage, visual basic
experience:
xxxx, inc.,xxxx spanision
marketing/web development consultant - internship
6/00 - 8/00
created the internet communication strategy and aligned it with the overall strategy of lycos to generate traffic for the a leading sites.
shaped the spanision’s internet strategy and created its identity as part of a marketing plan.
developed the web site and documented maintenance procedures. the web site increased the spanision’s visibility (more than 5000 hits in less than 4 days).
xxxcorporation,
project lead, xxxcollege mba consulting team
1/00 - 5/00
as part of a team, analyzed processes, mapped the supply chain procedure using visio flow chart and i-think business process simulation software. the blueprint highlighted non-value added activities in the supply chain.
identified non-value added activities and suggested improvements for better process integration.
xxxinternational,
management executive
3/98 - 7/99
implemented sap r/3 materials management module as a functional consultant with a team headed by pwc.
analyzed the effects of standardization and sourcing in low-labor cost countries, and identified potential savings of $7 million during a worldwide cost cutting project.
developed the project’s metrics and systems for the financial reporting to the headquarters in xxx
oversaw the supply management database and provided cost saving status reports using sql and ms access that enabled the monitoring of the cost cutting effort.
redesigned the manufacturing and procurement processes of the unit, resulting in lower inventory levels.
xxxx
information technology manager
9/97 - 3/98
designed xxx’s web site using html and java and installed windows nt lan.
activities:
executive vice president of the graduate information systems association xxx college.
winner of the xxxbusiness bowl case competition (graduate level), february 1999.
reading, dancing, tennis, swimming, web site design and development.
s("content_relate");【it管理人員英語簡歷范文】相關(guān)文章:
公司管理人員錄用制度
08-18
施工管理人員安全培訓(xùn)考題08-24
2017年公司管理人員錄用制度08-19
報(bào)檢員個(gè)人求職簡歷范文10-08
報(bào)檢員個(gè)人簡歷范文10-07
專八英語英語作文練習(xí)(范文)08-14
英語簡歷寫作技巧之個(gè)人信息10-02
關(guān)于英語閱讀范文11-14
英語閱讀參考范文11-11
分享英語閱讀范文11-11